FILOMENA RESTITUYO LOPEZ Dominican Republic Phone:+1809 528 7490 E-mail: filomena_rl@hotmail.com PLANNER / SCHEDULER Dedicated
in providing realistic scheduling/planning support by using industry driven
practices and procedures. PROFESSIONAL
EXPERIENCE ABEINSA EPC/ABENGOA -
USA
April 2012 – Jun 2014 Planner/ Scheduler at Mojave Solar Plant (280 MW) – California (Oct 2013 – Jun 2014) Planner / Scheduler at the Solana Solar Plant (280
MW) – Arizona (Mar 2012 – Sep 2013) · Developed
the Commissioning/Startup schedule program, to plan work and integrate
project scope with the involvement of the Commissioning team. · Prepared
baseline schedule to meet contract requirements. · Created
tracking and monitoring forms · Maintained
and analyzed project commodity curves in order to identify the strengths and
weaknesses of work processes, and in turn provide new solutions to problems · Prepared
and issued weekly and monthly reports to project stake holders. · Updated
weekly schedule check for deviations, critical path accuracy, constrained
dates, durations, logic, sequencing, scope of work. · Communicated
critical schedule issues and concerns. · Assessed
startup schedule with regard to the technical specifications of Contracts in
order to ensure the schedules met their requirements. · Performed
third-party schedule reviews and analysis, including the preparation of
reports and layouts. · Maintained
schedule files for each project revision in a timely and organized manner. · Lead
regular Project team meetings to communicate schedule related issues between
Engineering, Construction and Startup. · Lead field
construction meetings to discuss construction progress, goals and
constraints. · Established
and maintained positive and effective working relationships with my team ABENER ENERGIA/ABENGOA -
Spain
Mar 2008 – Mar 2012 Project Planner for the Solacor Solar Plant #1 and
Solacor Solar Plant #2 (50 MW) Mar 2010 – Feb 2012. Cordoba, Spain Project Planner for the Solnova Solar Plant #3 (50
MW) Apr 2008 – Feb 2010 Seville,
Spain · Developed
the project plan, critical path and baselines (using Primavera Project
Planner) · Designed
project evolution graphs · Updated
the planning schedules on a periodic basis · Developed
and implemented required on-site programs · Integrated
the subcontractor schedules with the main project schedule · Created
reports informing the project directors of project progress, possible delays,
potential problems, and alternative solutions that could develop throughout
the project. SAMPOL, INGENIERIA Y OBRAS
– Spain Jun 2007 – Feb 2008 Industrial
Technical Engineer · Implemented
the Maintenance Management Software (AMOS Maintenance) used to monitor the
Cogeneration Plant which supplied electrical, refrigeration, and thermal
energy to Terminal 4 of the Barajas Airport in Madrid, Spain. · Provided
technical assistance to the Engineering Department. · Tracked
and monitored technical documentation. EMPRESA GENERADORA DE
ELECTRICIDAD ITABO, S.A. Dominican Republic (Sep 1999 –
Feb 2005). For
the Production Management Department: Management and Monitoring of Incident Investigation
Reports [Root Cause Analysis (RCA)] Responsibly. (Oct 2004 – Feb 2005) Evaluated
the incident and/or failure, coordinated and monitored the incident or failure
investigation teams, revised reports, monitored and checked the
recommendations in these reports and updated the Plant Reliability Program. Plant Rehabilitation Project and Itabo Expansion. The project consisted of rehabilitating 2 Carbon
Plants (128 MW and 132 MW) back to their original settings. Rehabilitation
process included: repair of the boiler, checking and implementing distributed
control system, steam turbine, electrical generator, carbon handling system,
water circulation system, electrical equipment, etc. Planner/
Scheduler (Sep 2001 – Sep 2004) · Developed
the project plan, critical path and baselines (using MS Project) · Designed
project evolution curves · Updated
the schedule on a periodic basis · Developed
the required on-site programs and created reports · Integrated
the subcontractor schedule with the main schedule · Reported
to project directors informing them of project progress, possible delays,
potential problems, and alternative solutions that could develop throughout
the project. Technical Assistance Engineer (Sep 1999 – May 2000) INTERNSHIPS: · Internship
in Operations and Maintenance of the gas turbines at the Itabo Thermal
Power Plant: Dominican Electricity Corporation – (1998) EDUCATION Mechanical
and Electrical Engineering Degree
(specializing in Electricity) - Universidad Autónoma de Santo Domingo – 2000
(This degree was approved in Spain as the equivalent to the official Spanish
degree of an Industrial Engineering specializing in Electricity) TECHNICAL SKILLS AND
ADDITIONAL TRAINING: · Construction
CPM Conference. Study and Training in the Critical Path Method of Planning
& Scheduling Analysis, Orlando, Jan 2014. · Advanced
Project Management in Primavera P6, Oracle Certified Training Course 106-P.
Jul 2014 · PHDA
Management Skills Program. Thunderbird School of Business. Jun 2012 · Assembly
of Schott Tubing. · Team work
for continuous improvement. · Problem
analysis and decision making. · Project
Management. · Advanced
MS-Project. · Advanced
Negotiation Techniques. · General
Technical Course on Thermo solar Power Stations. · Course on
Occupational Risk Prevention in the HTF System of Thermo solar Power Plants. · Steam
Turbines in Thermo solar Power Plants. · Microsoft
Excel, Microsoft Word · ISO
9001:2000 Quality Certification. · Investigation
into Incidents [Root Cause Analysis] El Paso Energy, Itabo. · Primavera
Project Planner (P3). Systec, (Mexico) · Business
Project Management. LANGUAGES ·
Spanish (Native language) ·
English (Fluent – read, write, and speak) PROFESIONAL
REFERENCES · Emilio
Orozco Deputy Director of US
and Canada Region- Abeinsa EPC Phone: +1 636 519 2622
(84122) / Email: emilio.orozco@abeinsaepc.abengoa.com · Pedro Cabanillas Project Development Director USA, Canada & Australia
- Abeinsa Development · Rick
Laurentius Commissioning Director
- Abeinsa EPC · Ramón
Reina Torres Operations Director -
Schneider Electric USA/Mexico · Craig
Blair
· Juan
Manuel Varo Email:
juanmanuel.varo@solar.abengoa.com |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Advanced |
|
|
Spanish |
Fluent |
|
|
|